WAZIPOINT Engineering Science & Technology: Wazipoint System Awarded the DCCI Kitchen and Dining Interior Construction

Tuesday, February 24, 2026

Wazipoint System Awarded the DCCI Kitchen and Dining Interior Construction

 

WAZIPOINT SYSTEM & DCCI

Project Confirmation: WAZIPOINT SYSTEM & DCCI

Project: DCCI Kitchen and Dining Interior Construction Contractor: Wazipoint Scope Summary: Interior finishing works for kitchen and dining area as awarded; all works to be executed as per the site engineer's instructions and to relevant standards.

Scope of Works Itemized

tem No

Description

Specification

Unit

Quantity

1

Tile Installation

2' x 2' tiles using existing tiles; include patent stone for slope

To be measured on site

2

Net Cement Finishing with Coloring

Cement screed finish with color matching as directed by engineer

To be measured on site

3

Aluminum Sliding Window

Silver color; 1.2 mm section; 5 mm glass; install per engineer

Each

As per site requirement

4

False Ceiling

Zipsum board false ceiling; install per engineer's directions

To be measured on site

5

Aluminum Sliding Door

1.5 mm section; Mercery glass; install per engineer

Each

As per site requirement

6

Painting Finishing

Berger or Robbialac; 3 coats; surface prep and finish per engineer

To be measured on site

7

Basin Reinstallation

Remove, re-level, and reinstall basin; plumbing check per engineer

Each

As required

8

Table and Chairs Repair

Repair structural and finish defects; match existing finish

Lot

As required


Technical Requirements and Quality Standards

  • Engineer Direction: All works to follow instructions and approvals from the site engineer before execution and at key milestones.
  • Tile Works: Ensure existing tiles are inspected for soundness; replace broken tiles only after engineer approval; maintain slope using patent stone to ensure drainage.
  • Cement Finishing: Use approved cement mix and pigment; achieve uniform color; cure as per standard practice.
  • Aluminum Works: Use specified section thicknesses; ensure frames are plumb and square; glazing to be sealed and weatherproofed.
  • False Ceiling: Zipsum board fixed to manufacturer recommendations; provide neat joints and suitable access panels where required.
  • Painting: Surfaces to be prepared, primed where necessary; apply three coats of specified brand; final shade to be approved on site.
  • Fixtures and Furniture: Reinstall basin with leak test; repair table-chairs to be structurally sound and finish-matched.


Assumptions, Exclusion, and Safety

  • Assumptions: Quantities will be finalized after site measurement; existing tiles are reusable unless damaged.
  • Exclusions: Major structural alterations, new plumbing rerouting beyond basin reinstallation, electrical rewiring, and supply of new furniture unless specified.
  • Safety: Contractor to follow site safety rules, provide PPE, and ensure safe disposal of debris.


Deliverables Acceptance and Handover

  • Progress Checks: Engineer inspection and sign-off at completion of tile laying, ceiling installation, glazing, and final painting.

  • Testing: Water tightness test for basin; functional check for sliding windows and doors.

  • Handover: Clean site, touch-up finishes, provide warranty period, and maintenance recommendations.


Next Steps

  • On-site Measurement: Conduct detailed measurement and prepare the final BOQ and price schedule.

  • Approval: Submit material samples and color swatches for engineer's approval.

  • Schedule: Prepare a work program with milestones and submit for engineer's review.

  • Point of Contact: Provide the site supervisor's name and contact for coordination.


Prepared for: DCCI Kitchen and Dining Interior Construction Project by WAZIPOINT SYSTEM.