Handover Form Metal Structure Badminton Court Dhaka Chamber of Commerce and Industry Rooftop
Project: Metal Structure Badminton Court Client: Dhaka Chamber of Commerce and Industry Contractor: WAZIPOINT SYSTEM Location: DCCI Head Office Building Rooftop Structure Type: Steel-framed rooftop badminton court Project Reference: WPS‑DCCI‑MSBC‑2026
WAZIPOINT SYSTEM has completed the metal-structure badminton court on the rooftop of the Dhaka Chamber of Commerce and Industry head office building.
Key project highlights
- Location: Dhaka Chamber of Commerce and Industry head office rooftop.
- Scope: Metal structural frame for a full-size badminton court; rooftop installation.
- Primary deliverable: Completed metal structure ready for finishing, fixtures, and handover.
- Status: Construction complete (structure).
Handover and quality checklist
- As‑built drawings and documentation — provide final structural drawings, shop drawings, and revision log.
- Load and structural test reports — proof of load testing, deflection checks, and connection integrity.
- Welding and NDT records — weld procedure specs, welder qualifications, and non‑destructive test results.
- Corrosion protection — coating/galvanizing certificates and inspection reports.
- Waterproofing and roof integrity — roof membrane inspection and leak‑test results where the structure interfaces with the roof.
- Anchorage and roof‑fixing details — anchor design, pull‑out tests, and roof load distribution plan.
- Safety and access — permanent access/egress, guardrails, fall‑protection provisions, and safe maintenance routes.
- Electrical and lighting provisions — conduit routes, light mounting points, and earthing/lighting protection notes.
- Drainage and runoff — roof drainage checks to ensure no ponding or added load from water.
- Flooring and finishing readiness — confirmation of substrate tolerances for final sports flooring.
- Net, posts, and equipment fitment — dimensions and fixing points verified for standard badminton equipment.
- Warranty and maintenance — structural warranty terms, recommended inspection intervals, and maintenance manual.
- Insurance and compliance — updated insurance endorsements and any required municipal/authority sign‑offs.
- Client sign‑off — formal completion certificate and snag list with timelines for rectification items.
Recommended next steps
- Deliver the full handover pack (documents listed above) to DCCI.
- Schedule a joint inspection with DCCI representatives and an independent structural engineer.
- Complete finishing works (flooring, nets, lighting) after structural sign‑off.
- Arrange an official handover and inauguration once all tests and finishes are complete.
- Set up a maintenance contract and first annual inspection date.
WAZIPOINT SYSTEM is pleased to announce the successful completion of the metal structural works for a full-size badminton court on the rooftop of the Dhaka Chamber of Commerce and Industry head office building. The project included precision fabrication, rooftop anchorage, corrosion protection, and structural testing. The installation now moves to finishing, sports flooring, lighting, and final commissioning prior to formal handover.
If you are interested in owning a badminton court, you may contact us; we are ready to materialize your dream.
No comments:
Post a Comment
WAZIPOINT:
Thank you very much to visit and valuable comments on this blog post. Keep in touch for next and new article. Share your friends and well-wisher, share your idea to worldwide.